2026, 07, v.66 61-66
群坑开挖钢管柱变形的数值模拟-数据驱动融合预测
基金项目(Foundation):
邮箱(Email):
DOI:
发布时间: 2026-07-20
出版时间: 2026-07-20
移动端阅读
摘要:

为揭示盖挖逆作法群坑协同开挖条件下钢管柱竖向变形规律并实现快速预测,本文依托某超大规模基坑群工程,采用现场监测与参数化数值模拟相结合的方法,系统分析不同开挖深度组合与开挖时序对钢管柱竖向抬升的影响。监测结果表明,钢管柱在施工过程中普遍发生竖向抬升,单侧开挖易引起明显非对称变形;当相邻基坑同步或近同步开挖时,结构变形协调性增强,不均匀抬升显著减弱。参数化数值模拟分析表明,深部开挖是控制竖向变形的主控因素,最大抬升量与开挖深度呈近似线性正相关。在此基础上,构建基于深度神经网络的智能预测模型,实现多工况条件下钢管柱竖向变形的快速评估,预测精度满足工程需求,可为群坑工程施工顺序优化与结构安全控制提供参考。

Abstract:

To investigate the vertical deformation of steel pipe columns in cover-and-cut top-down construction under group-pit excavation and enable rapid prediction, this study took a super-large pit cluster as the research background. Field monitoring and parametric numerical simulations were conducted to evaluate the effects of excavation depth combinations and excavation sequences. The results show that column uplift commonly occurs during construction, and unilateral excavation causes pronounced asymmetric deformation. In contrast, simultaneous or nearly simultaneous excavation of adjacent pits improves deformation compatibility and significantly reduces uneven uplift. Numerical simulation analyses indicate that deep excavation is the dominant factor, and the maximum uplift increases approximately linearly with excavation depth. A deep neural network model was further developed for fast uplift prediction under multiple scenarios, achieving acceptable engineering accuracy. The findings provide support for excavation-sequence optimization and structural safety control in large-scale group-pit projects.

参考文献

[1]邵毅安,蒋超.富水地层基坑群开挖空间效应研究[J].土木工程与绿色建筑,2025,1(2):109-113.Shao Yian,Jiang Chao. Study on the spatial effect of excavation of foundation pit groups in water-rich strata[J].Civil Engineering and Green Building,2025,1(2):109-113.

[2]杨喻声,何荣,陈思奇,等.邻近地铁深大基坑群减压降水环境影响控制研究[J].建筑施工,2025,47(7):1115-1119.Yang Yusheng,He Rong,Chen Siqi,et al. Study on environmental impact control of pressure-relief dewatering in large deep foundation pit groups near metro lines[J].Building Construction,2025,47(7):1115-1119.

[3]杜万强.广深港客运专线福田站大直径钢管混凝土立柱施工技术[J].铁道建筑,2013,53(5):87-89.Du Wanqiang.Construction technology of large-diameter steel pipe concrete columns at futian station of the GuangzhouShenzhen-Hong Kong passenger dedicated line[J]. Railway Engineering,2013,53(5):87-89.

[4]李然,王圣涛,申志军,等.铁路深基坑格构桁架支撑替代钢换撑模拟分析与工程实践[J].铁道建筑,2024,64(11):17-22.Li Ran,Wang Shengtao,Shen Zhijun,et al. Numerical simulation and engineering practice on steel support replacement with lattice truss in deep railway foundation pit[J].Railway Engineering,2024,64(11):17-22.

[5]缪丹,聂竹林,何楚韶.基于数理统计分析法的基坑监测预警值研究[J].建筑结构,2025,55(24):136-143.Miao Dan,Nie Zhulin,He Chushao. Research on early warning value for foundation pit monitoring based on mathematical statistical analysis method[J]. Building Structure,2025,55(24):136-143.

[6]王卫东,徐中华,顾正瑞,等.软土地层地铁隧道受两侧基坑群开挖叠加影响研究[J].隧道建设(中英文),2024,44(增刊2):52-61.Wang Weidong,Xu Zhonghua,Gu Zhengrui,et al.Superposed effects on deformation of metro tunnels in soft soils caused by excavation of foundation pits on both sides[J]. Tunnel Construction,2024,44(S2):52-61.

[7]蒋雪鹏,徐佳萌,陈永庆,等.地下结构超深钢管柱高精度安装施工技术研究[J].土木工程与绿色建筑,2025,1(3):109-112.Jiang Xuepeng,Xu Jiameng,Chen Yongqing,et al.Research on high-precision installation and construction technology of ultra-deep steel pipe columns for underground structures[J].Civil Engineering and Green Building,2025,1(3):109-112.

[8]杨益,刘明进,杜涛,等.盖挖逆作法地铁车站大直径超长钢管柱施工技术研究[J].工程建设,2025,57(5):63-71.Yang Yi,Liu Mingjin,Du Tao,et al.Technology research on construction of largediameter and ultra long steel pipe columns for cover and cut top-down method in the subway station[J].Engineering Construction,2025,57(5):63-71.

[9]侯朝,杨阳,刘泽宏,等.综合交通枢纽工程盖挖逆作法研究与应用[J].建筑技术,2025,56(1):65-68.Hou Chao,Yang Yang,Liu Zehong,et al. Study on and application of covered top-down excavation in comprehensive transportation hub engineering[J]. Architecture Technology,2025,56(1):65-68.

[10]吴余海.盖挖逆作施工群塔布置设计及作业技术研究[J].施工技术(中英文),2025,54(11):97-101.Wu Yuhai. Layout design and operation technology of group tower in top-down construction[J].Construction Technology,2025,54(11):97-101.

[11]宗秀金,王帅亮,李建.软土地基逆作法超深基坑变形控制:以苏州中南中心为例[J].工程建设,2024,56(12):62-68,81.Zong Xiujin,Wang Shuailiang,Li Jian.Deformation control of ultra deep foundation pit using reverse construction method for soft soil foundation-taking Suzhou Zhongnan Center as an example[J]. Engineering Construction,2024,56(12):62-68,81.

[12]魏纲,木志远,吴海峰,等.超长期服役基坑对既有隧道的时空效应研究[J].河南城建学院学报,2024,33(6):64-73.Wei Gang,Mu Zhiyuan,Wu Haifeng,et al. Temporal and spatial effects of ultra-long-term service foundation pits on existing tunnels[J]. Journal of Henan University of Urban Construction,2024,33(6):64-73.

[13]陈永才,苏银君,翁其平,等.紧邻历史建筑的临江深基坑上下同步逆作与变形控制[J].建筑结构,2025,55(4):139-146.Chen Yongcai, Su Yinjun, Weng Qiping, et al.Synchronous construction of super and underground structure and deformation control of deep foundation pit adjacent to river and historical buildings[J].Building Structure,2025,55(4):139-146.

[14]门小雄,姚康,冷伍明,等.考虑被动区桩效应的滨海深基坑稳定性研究[J].铁道科学与工程学报,2025,22(8):3504-3516.Men Xiaoxiong,Yao Kang,Leng Wuming,et al. Study on stability of a deep excavation in coastal deposit considering the effect of piles in the passive zone[J].Journal of Railway Science and Engineering,2025,22(8):3504-3516.

基本信息:

中图分类号:TU753

引用信息:

[1]刘冬,王浩,张兆龙,等.群坑开挖钢管柱变形的数值模拟-数据驱动融合预测[J].铁道建筑,2026,66(07):61-66.

发布时间:

2026-07-20

出版时间:

2026-07-20