我国一座64m下承式栓焊钢桁梁在25t轴重列车长期作用下,梁端节点与支座连接角钢和节点内侧H形立柱产生了疲劳裂纹。针对这种情况,建立了梁端节点局部有限元模型,分析了不同等级横向力与端斜杆极端荷载作用下,梁端节点的应力分布情况,明确了裂纹产生的原因,制定了加固方案并进行了验证。计算结果表明支座角钢应力场受横向荷载的影响较大,在支座沉降、温度作用及重载列车等外部因素作用下可能会放大该处横向作用,进而增大应力水平,使得连接角钢螺栓孔边和H形立柱内侧翼缘与腹板焊缝处萌生微裂纹并逐步扩展,最终发展为宏观裂纹。提出的加固方案为将支座连接角钢厚度增加,同时节点内侧对称位置处增设角钢,H形立柱建议更换为同尺寸或厚度稍大的H形立柱,焊缝采用全熔透焊接工艺,并在焊趾处进行超声波冲击,也可采用角钢与钢板组合的方式替换原有立柱,避免采用焊缝以提高疲劳强度。加固方案有限元计算结果表明,将原连接角钢厚度增加,同时在节点内侧新增角钢后可将最大应力降低约30%,同时改善节点区应力梯度分布,提升疲劳性能。

Abstract:

A 64m through bolted-welded steel truss girder in China developed fatigue cracks at the beam-end joint connection with the support and on the inner side of the joint under the long-term action of 25t axle load trains. To address this issue, a local finite element model of the beam-end joint was established. The stress distribution at the joint under different levels of transverse forces and extreme loads on the end diagonal member was analyzed. The causes of the cracks were identified, a reinforcement solution was proposed, and its effectiveness was verified. The calculation results indicate that the stress field of the end support angle steel is significantly influenced by transverse loads. External factors such as support settlement, temperature effects, and heavy-haul trains may amplify the transverse action at this location, thereby increasing the stress levels. This leads to the initiation of micro-cracks at the bolt holes of the connecting angle steel and the weld between the flange and web of the inner side of the H-shaped vertical member. These micro-cracks gradually propagate, eventually developing into macroscopic cracks. The proposed reinforcement solution involves increasing the thickness of the support connecting angle steel, adding angle steel at symmetric positions on the inner side of the joint, and replacing the H-shaped vertical member with a H-shaped member of the same size or slightly larger thickness. A full-penetration welding process is recommended for welds, along with ultrasonic impact treatment at the weld toes. Alternatively, the H-shaped vertical member could be replaced with a combination of angle steel and steel plate to avoid welds and enhance fatigue strength. Finite element analysis results for the reinforcement solution show that adding thicker angle steel on the inner side of the joint can reduce the maximum stress by approximately 30%, while also improving the stress gradient distribution in the joint region and enhancing fatigue performance.

基本信息:

中图分类号:U445.72

引用信息:

[1]程乐文,王丽,张广为,等.栓焊钢桁梁梁端节点连接角钢裂纹成因分析及加固方案研究[J].铁道建筑().

基金信息:

中国铁道科学研究院集团有限公司基金(2024YJ235)

发布时间:

2026-05-21

出版时间:

2026-05-21

网络发布时间:

2026-05-21

检 索 高级检索

引用

GB/T 7714-2015 格式引文
MLA格式引文
APA格式引文