无背索斜拉桥的斜塔、斜拉索和主梁间需要受力协调平衡,斜拉索力是三者间受力协调平衡的主动参数。基于无背索斜拉桥斜塔在施工状态和成桥状态均必须静力平衡这一关键受力特征,本文通过力学分析和公式推导,结合施工过程建立有限元模型,求解张拉索力、施工期索力和成桥索力。结果表明:无背索斜拉桥的斜塔整体平衡索力并不等于有索区段的局部平衡索力,无背索斜拉桥的成桥索力从下端到上端逐渐减小;斜塔有索区长度占比大于0.8时,可以近似采用有索区局部平衡索力代替根部总体平衡索力;斜塔有索区段长度占比越大,各索力越接近;无背索斜拉桥应以斜塔的受力状态为主要目标求解施工期索力和成桥索力,且施工期索力和成桥索力大致相等。
Abstract:The inclined pylon, stay cable and main beam of a cable-stayed bridge without backstays require force coordination and balance, and the stay cable force is the active parameter. Based on the key force characteristic that the inclined tower of a cable-stayed bridge without backstays must be statically balanced in both construction and completion states, the cables' tension forces, construction forces, and completion forces are solved just once, through mechanical analysis, formula derivation and FEM(finite element method) model that simulates the construction process. The analysis results indicate that the overall equilibrium cable force of the inclined pylon for a cable-stayed bridge without backstays is not equal to the local equilibrium cable force in the cable-stayed segment. The cable forces of a cable-stayed bridge without backstays gradually decreas from the lower end to the upper end. When the cable zone's length proportion in the inclined tower is greater than 0.8, the cable force of local balance in the cable zone can be approximately used to replace the cable force of overall balance in the root. The larger the cable zone's length proportion in the inclined tower, the closer the cable force values are to being equal. The main objective to solve the cable forces during bridge construction and completion should be the stress state of the inclined tower for cablestayed bridges without backstays, and the cable forces are roughly equal in the construction and completion states.
[1]易云焜.曲线形独塔无背索斜拉桥施工控制关键技术[J].桥梁建设,2018,48(2):116-120.Yi Yunkun. Key technology of construction monitoring for single curved pylon cable-stayed bridge without backstays[J].Bridge Construction,2018,48(2):116-120.
[2]王春飞.独塔无背索混合塔斜拉桥施工技术与创新[J].铁道建筑技术,2024(11):123-127.Wang Chunfei. Construction technology and innovations of a single-tower,back-stay-free hybrid pylon cable-stayed bridge[J].Railway Construction Technology,2024(11):123-127.
[3]黄积勇.人行无背索曲线斜拉景观桥梁设计与分析[J].中国市政工程,2022(3):1-3.Huang Jiyong. Municipal engineering design & analysis of pedestrian curved cable-stayed landscape bridge without backstays[J].China Municipal Engineering,2022(3):1-3.
[4]韩再明.长春市伊通河独塔无背索斜拉桥施工关键技术[J].公路交通科技,2006(9):129-130.Han Zaiming. Key construction technologies for the single-pylon cable-stayed bridge without backstays over Yitong River in Changchun[J].Journal of Highway and Transportation Research and Development,2006(9):129-130.
[5]胡跃,陈勇.贵溪大桥独斜塔无背索斜拉桥塔梁同步施工技术[J].城市道桥与防洪,2012(9):184-186.Hu Yue,Chen Yong.Synchronous construction technology of tower and girder for the single-inclined-tower cable-stayed bridge without backstays of Guixi Bridge[J]. Urban Roads Bridges&Flood Control,2012(9):184-186.
[6]辛德彭,杨彬.楠溪江拦河闸枢纽左岸独塔无背索斜拉桥施工方案研究[J].水利水电技术,2015,46(8):60-61.Xin Depeng,Yang Bin. Study on construction scheme of single-pylon cable-stayed bridge without backstays on left bank of Nanxi River sluice hub[J]. Water Resources and Hydropower Engineering,2015,46(8):60-61.
[7]吴洪峰,孙宁.无背索斜拉桥设计及施工控制技术[J].公路,2012,17(1):108-112.Wu Hongfeng,Sun Ning. Design and construction control technology of cable-stayed bridge without backstays[J].Highway,2012,17(1):108-112.
[8]邵旭东,陈爱军,李立峰.长沙市洪山大桥的创新设计[J].中外公路,2005,15(2):68-71.Shao Xudong,Chen Aijun,Li Lifeng. Innovative design of Hongshan Bridge in Changsha City[J]. Journal of China&Foreign Highway,2005,15(2):68-71.
[9]李杨.基于响应面法的无背索斜拉桥节段施工计算模型修正[D].郑州:郑州大学,2022:16-17.Li Yang.Update of segmental construction calculation model of cable-stayed bridge without back cable based on response surface method[D].Zhengzhou:Zhengzhou University,2022:16-17.
[10]高红帅.既有无背索斜拉桥索力调整与内力分析[D].哈尔滨:东北林业大学,2014:35.Gao Hongshuai.The cable force adjustment and internal force analysis of existing cable-stayed bridge without backstays[D].Harbin:Northeast Forestry University,2014:35
[11]李杰,陈淮.无背索部分斜拉桥斜拉索张拉施工方案分析[J].桥梁建设,2012,42(2):103-108.Li Jie,Chen Huai. Analysis of construction schemes for tensioning stay cables of extradosed bridge without backstays[J].Bridge Construction,2012,42(2):103-108.
[12]黄晨光,林丽霞,丁南宏.基于膜结构假定的无背索斜拉桥主梁轴力解析[J].兰州工业学院学报,2021,28(3):1-5.Huang Chenguang,Lin Lixia,Ding Nanhong.Analysis of axial force of main girder of no backstays cable stayed bridge based on membrane structure assumption[J]. Journal of Lanzhou Institute of Technology,2021,28(3):1-5.
[13]程宏斌.独塔无背索曲线钢管梁斜拉桥设计与分析[J].中国市政工程,2023(1):16-19.Cheng Hongbin.Design&analysis of curved steel tube girder cablestayed bridge with single tower&non-backstays[J].China Municipal Engineering,2023(1):16-19.
[14]葛欢,林丽霞.基于材料强度的无背索斜拉桥极限跨径研究[J].结构工程师,2023,39(4):19-25.Ge Huan,Lin Lixia.Research on ultimate span of cable-stayed bridge without back cable based on material strength[J].Structural Engineers,2023,39(4):19-25.
[15]荀敬川,刘吉诚,彭晶蓉,等.斜拉索张拉与主梁浇筑误差对无背索斜拉桥的影响研究[J].中外公路,2020,40(1):75-79.Xun Jingchuan,Liu Jicheng,Peng Jingrong,et al. Study on influence of cable tensioning and girder casting errors on cable-stayed bridge without backstays[J]. Journal of China and Foreign Highway,2020,40(1):75-79.
[16]陈双庆,王树英,吕文舒,等.无背索斜塔斜拉桥的模态分析及1∶1内共振研究[J].公路交通科技,2021,38(8):75-82.Chen Shuangqing,Wang Shuying,LüWenshu,et al. Modal analysis and 1∶1 internal resonance study on inclined pylon cable-stayed bridge without backstay[J].Journal of Highway and Transportation Research and Development,2021,38(8):75-82.
基本信息:
中图分类号:U448.27
引用信息:
[1]易云焜,吴东炜,徐梦莹,等.无背索斜拉桥基于斜塔平衡的合理索力求解[J].铁道建筑,2026,66(08):14-19.