混合梁刚构桥跨中组合箱梁与支点混凝土箱梁纵向连接,可减轻结构自重并改善主梁长期刚度,有望作为主跨200 m的特大跨度高速铁路桥梁推荐方案。钢混结合段是主梁材料和刚度突变部位,为混合梁结构设计的关键环节之一。为探究该钢混结合段的不利工况受力特性,建立空间板壳-实体有限元模型,采用三维弹簧单元模拟剪力连接件,分析其受力、传力机理及合理构造。结果表明:最大负弯矩工况为该钢混结合段不利受力工况之一,主梁轴力与负弯矩使组合箱梁钢底板承受较大的纵向压应力。该应力从承压板向钢混交界线逐渐减小,钢结构通过承压板和连接件向钢格室内填充混凝土逐步传力。该连接件分担约40%的弯矩与轴力,是钢混结合段的重要传力部件。较长的钢混结合面可布置多排焊钉连接件,但钢混交界线处的前排焊钉承受较大的纵向剪力,可能超出铁路桥梁焊钉剪力设计限值。将前排焊钉根部包裹橡胶而形成柔性焊钉,与其余普通焊钉混合布置,使焊钉最大剪力减小约50%。该钢混结合段连接构造可避免焊钉剪力集中,为同类桥梁设计提供了参考。
Abstract:The longitudinal connection between the composite box girder at the midspan and the concrete box girder at the supports in a hybrid girder rigid-frame bridge can reduce the structural self-weight and improve the long-term stiffness of the main girder, making it a promising candidate for extra-long-span high speed railway bridges with a main span of 200 m. The steel-concrete joint section is a region where both material and stiffness change abruptly; therefore, it is one of the critical design aspects of the hybrid girder structure. To investigate the mechanical performance of this joint section under unfavorable loading conditions, a spatial plate-shell-solid finite element model was established, in which three-dimensional spring elements were used to simulate the shear connectors. The stress distribution, load-transfer mechanism, and rational structural detailing were analyzed. The results show that the maximum negative bending moment case is one of the critical loading conditions. The axial force and negative bending moment cause the steel bottom plate of the composite box girder to sustain relatively large longitudinal compressive stresses. These stresses gradually decrease from the bearing plate towards the steel-concrete interface, indicating that the steel structure transfers the loads progressively to the concrete infill in the steel cellular compartments through the bearing plate and the connectors. The connectors share approximately 40% of the bending moment and axial force, serving as vital components for force transmission in the joint. A longer steel-concrete interface allows multiple rows of stud connectors to be arranged; however, the front-row studs near the interface experience relatively large longitudinal shear forces, which may exceed the design shear limit for studs in railway bridges. By wrapping the roots of the front-row studs with rubber to form flexible studs and arranging them in combination with ordinary studs, the maximum shear force in the studs can be reduced by about 50%. This connection detail effectively avoids shear concentration in the studs and provides a reference for the design of similar railway hybrid girder rigid-frame bridges.
[1]刘玉擎.混合梁接合部设计技术的发展[J].世界桥梁,2005,33(4):9-12.Liu Yuqing.Development of design technique for joint parts of hybrid girder[J].World Bridges,2005,33(4):9-12.
[2]邓文中,代彤.重庆石板坡长江大桥复线桥总体设计[J].桥梁建设,2006,36(6):28-32.Deng Wenzhong,Dai Tong.Overall design of double-line bridge of Shibanpo Changjiang River Bridge in Chongqing[J].Bridge Construction,2006,36(6):28-32.
[3]Liu R,Liu Y Q.Analysis of auxiliary ribs in steel-concrete joint of hybrid girder[J].Journal of Constructional Steel Research,2015,112:363-372.
[4]范慧敏,郑双杰,李海锋,等.整体式桥台与组合梁结合部受力机理分析[J].建筑钢结构进展,2023,25(7):85-94.Fan Huimin,Zheng Shuangjie,Li Haifeng,et al.Stress mechanism analysis of the joint between integral abutment and composite beam[J].Progress in Steel Building Structures,2023,25(7):85-94.
[5]徐国亮.高速铁路钢混混合刚构桥钢混结合段关键施工技术[J/OL].铁道建筑,2026-04-10.https://link.cnki.net/urlid/11.2027.u.20260409.1759.008.Xu Guoliang.Key construction technology of steel-concrete joint section in high-speed railway hybrid girder rigidframe bridge[J/OL].Railway Engineering,2026-04-10.https://link.cnki.net/urlid/11.2027.u.20260409.1759.008.
[6]刘荣,余俊林,刘玉擎,等.鄂东长江大桥混合梁结合段受力分析[J].桥梁建设,2010,40(3):33-35.Liu Rong,Yu Junlin,Liu Yuqing,et al.Mechanical analysis of joint sections of hybrid girder of Edong Changjiang River Bridge[J].Bridge Construction,2010,40(3):33-35.
[7]田军伟,郑罡,唐光武,等.重庆石板坡长江大桥复线桥钢-混凝土接头模型静载与疲劳试验研究[J].公路交通技术,2007,23(2):113-117.Tian Junwei,Zheng Gang,Tang Guangwu,et al.Research on static load and fatigue test for steel-concrete connector model on new Chongqing Shibanpo Yangtze River Bridge[J].Technology of Highway and Transport,2007,23(2):113-117.
[8]徐国平,张喜刚,刘玉擎,等.混合梁斜拉桥[M].北京:人民交通出版社,2013:120-125.Xu Guoping,Zhang Xigang,Liu Yuqing,et al.Hybrid girder cablestayed bridge[M].Beijing:China Communications Press,2013:120-125.
[9]张光辉,陈聪,刘玉擎.混合梁结合部格室-承压板协同作用机理[J].同济大学学报(自然科学版),2017,45(5):658-663.Zhang Guanghui,Chen Cong,Liu Yuqing.Load transfermechanism between cells and bearingplate in hybrid girder joint[J].Journal of Tongji University (Natural Science),2017,45(5):658-663.
[10]施洲,贾文涛,宁伯伟,等.高铁大跨度斜拉桥主梁钢混结合段力学性能研究[J].铁道学报,2023,45(3):37-46.Shi Zhou,Jia Wentao,Ning Bowei,et al.Study on mechanical performance of steel-concrete composite segment of main girder of long span cable-stayed railway bridge[J].Journal of the China Railway Society,2023,45(3):37-46.
[11]王太奇,王淑敏,马广,等.混合梁斜拉桥开口格室结合部承载性能试验研究[J].建筑钢结构进展,2025,27(3):32-37.Wang Taiqi,Wang Shumin,Ma Guang,et al.Experimental study on bearing properties of the composite joint with opened cell used in hybrid girder cable-stayed bridges[J].Progress in Steel Building Structures,2025,27(3):32-37.
[12]蔺钊飞,刘玉擎,贺君.焊钉连接件抗剪刚度计算方法研究[J].工程力学,2014,31(7):85-90.Lin Zhaofei,Liu Yuqing,He Jun.Research on calculation method of shear stiffness for headed stud connectors[J].Engineering Mechanics,2014,31(7):85-90.
[13]郑双杰,刘玉擎.开孔板连接件初期抗剪刚度试验[J].中国公路学报,2014,27(11):69-75.Zheng Shuangjie,Liu Yuqing.Experiment of initial shear stiffness of perfobond connector[J].China Journal of Highway and Transport,2014,27(11):69-75.
[14]Xu X Q,Liu Y Q.Analytical and numerical study of the shear stiffness of rubber-sleeved stud[J].Journal of Constructional Steel Research,2016,123:68-78.
基本信息:
中图分类号:U448.23
引用信息:
[1]陈丽君,刘荣,王璐华,等.混合梁刚构桥钢混结合段不利工况受力分析[J].铁道建筑,2026,66(08):8-13.
基金信息:
国家自然科学基金(51978245)
2026-08-20
2026-08-20