摘要:

为解决城市暗挖地铁车站与区间隧道施工工期存在较大矛盾的问题,在分析复杂敏感环境下地铁车站建设所面临的挑战后,结合现有暗挖地铁车站施工方法及经验,以青岛地铁5号线宁夏路站工程为背景,提出了一种新的暗挖地铁车站施工方法——先站后隧再站法。分析了先站后隧再站法的设计理念,总结了站厅层开挖及支护、区间隧道永久管片与站域临时管片接口连接、站域临时管片拼装与破除、区间隧道永久管片拉紧加固、站厅层临时支撑拆除、站台层开挖及支护等关键技术,并根据现场监测数据对地表沉降和车站拱顶沉降进行了分析。实践结果表明:采用先站后隧再站法进行施工,实现了车站与区间隧道施工的并行作业,解决了现有施工方法中车站与区间隧道施工工期存在较大矛盾的问题。相较于现有暗挖施工方法,能更好地保证车站与区间隧道施工的连续性。经现场监测反馈,采用本文的施工方法后地表沉降和车站拱顶沉降均满足控制要求。

Abstract:

To address the significant conflict in construction schedules between urban mined metro stations and interval tunnels, this study proposed a new construction method for mined metro stations, namely the station-tunnel-station method, based on an analysis of the challenges associated with metro station construction in complex and sensitive urban environments, as well as existing construction methods and practical experience of mined metro stations. The Ningxia Road Station project of Qingdao Metro Line 5 was taken as the engineering background. The design concept of the station-tunnel-station method was analyzed, together with its key technologies, including excavation and support of the concourse level, interface connection between the interval tunnel permanent segments and station-area temporary segments, assembly and demolition of station-area temporary segments, tensioning reinforcement of interval tunnel permanent segments, removal of temporary supports at the concourse level, and excavation and support of the platform level. In addition, ground surface settlement and station arch crown settlement were analyzed based on field monitoring data. The practical results indicate that the application of the station-tunnel-station method enables parallel construction of the station and interval tunnels, thereby resolving a prominent scheduling conflict between station and interval tunnel construction in conventional methods. Compared with existing mined construction methods, the proposed method better ensures the continuity of station and interval tunnel construction. Field monitoring results show that both the ground surface settlement and station arch crown settlement induced by the proposed construction method satisfy the specified control limits.

参考文献

[1]孙铁成,王爱玉,张岩俊,等.囊袋式注浆对盾构下穿高速铁路路基沉降的控制效果[J].铁道建筑,2024,64(9):120-126.SUN Tiecheng,WANG Aiyu,ZHANG Yanjun,et al. Control Effect of Capsuled Grouting on Settlement While Shield Tunneling Underpass High Speed Railway Subgrade[J].Railway Engineering,2024,64(9):120-126.

[2]陈海勇,郑晓悦,施成华,等.复杂地层大直径越江盾构隧道施工重难点及关键技术——以武汉地铁12号线国—凌段越江隧道工程为例[J].现代隧道技术,2024,61(4):244-254.CHEN Haiyong,ZHENG Xiaoyue,SHI Chenghua,et al.Construction Challenges and Key Construction Technologies for Large-diameter River-crossing Shield Tunnels in Complex Strata:A Case Study of the Running Tunnel Section Between Guobo Center South Station and Lingwu Village Station of the Wuhan Metro Line 12[J]. Modern Tunnelling Technology,2024,61(4):244-254.

[3]李智.地铁附属改造项目常见问题分析与建议——以广佛线季华园站为例[J].隧道建设(中英文),2018,38(11):1846-1852.LI Zhi. Analysis and Suggestions on Common Problems in Metro Affiliated Reconstruction Projects:a Case Study of Jihuayuan Station on Guangzhou—Foshan Line[J]. Tunnel Construction,2018,38(11):1846-1852.

[4]宋战平,李雪莉,张玉伟,等.我国地铁车站暗挖工法综述与展望[J].现代隧道技术,2025,62(2):1-15.SONG Zhanping,LI Xueli,ZHANG Yuwei,et al.Review and Prospect of the Mining Construction Methods for Subway Stations in China[J].Modern Tunnelling Technology,2025,62(2):1-15.

[5]戴志仁,胡瑞青,杨自刚,等.砂卵石地层浅埋地铁车站暗挖施工关键技术[J].铁道工程学报,2024,41(10):83-89.DAI Zhiren,HU Ruiqing,YANG Zigang,et al. Key Technologies for Underground Excavation of Metro Station with Shallow Buried Depth in Sand and Gravel Stratum[J].Journal of Railway Engineering Society,2024,41(10):83-89.

[6]王祥,王春凯.城区大跨度地铁车站新型暗挖工法探索与实践[J].城市轨道交通研究,2025,28(7):66-71.WANG Xiang,WANG Chunkai. Exploration and Practice of New Underground Excavation Method for Large Span Metro Station in Urban Area[J].Urban Mass Transit,2025,28(7):66-71.

[7]李克先,李术才,赵继增.大跨度暗挖地铁车站开挖工序优化研究[J].地下空间与工程学报,2017,13(5):1329-1337.LI Kexian,LI Shucai,ZHAO Jizeng. Study on Optimizing Excavation Construction of Large Span Subway Station[J].Chinese Journal of Underground Space and Engineering,2017,13(5):1329-1337.

[8]高晓刚,尹学鑫,崔凯,等.浅埋超大跨多导洞拱盖法地铁区间导洞施工方案优化研究[J].城市轨道交通研究,2023,26(8):65-70.GAO Xiaogang,YIN Xuexin,CUI Kai,et al.Optimization of Pilot Tunnel Construction Scheme for Shallow-buried Superlarge-span Metro Interval by Multi Guiding-hole Arch-cover Method[J].Urban Mass Transit,2023,26(8):65-70.

[9]韦迪.冻土区先隧后站法扩挖地铁车站的变形规律研究[D].北京:北京交通大学,2021.WEI Di. Study on Deformation Law of Subway Station Excavation by Tunnel First and Station Later Method in Frozen Soil Area[D]. Beijing:Beijing Jiaotong University,2021.

[10]孙长军,张顶立,郑昊,等.PBA大直径盾构隧道扩挖车站施工的关键技术[J].北京交通大学学报,2015,39(1):21-27.SUN Changjun,ZHANG Dingli,ZHENG Hao,et al.Study of Key Techniques of Metro Stations Construction Using PBA Based Enlarging Large Diameter Shield Tunnel[J]. Journal of Beijing Jiaotong University,2015,39(1):21-27.

[11]魏纲,林志颖,王霄,等.先隧后站(井)法关键技术研究现状及展望[J].现代隧道技术,2023,60(1):11-22.WEI Gang,LIN Zhiying,WANG Xiao,et al. Present Status and Prospect of the Study on Key Technologies of Tunnel Ahead and Station(Shaft)Following Method[J]. Modern Tunnelling Technology,2023,60(1):11-22.

[12]戴志仁,王俊,胡瑞青.城市轨道交通大直径盾构隧道若干关键技术[J].铁道工程学报,2021,38(6):75-81.DAI Zhiren,WANG Jun,HU Ruiqing. Key Technologies for the Application of Large Diameter Shield Tunnel in Urban Railway[J].Journal of Railway Engineering Society,2021,38(6):75-81.

基本信息:

中图分类号:U231.3

引用信息:

[1]魏永亮,殷耀垒,王小纬,等.大跨浅埋暗挖地铁车站先站后隧再站施工技术实践[J].铁道建筑().

基金信息:

国家自然科学基金(52178402)

发布时间:

2026-06-05

出版时间:

2026-06-05

网络发布时间:

2026-06-05

检 索 高级检索

引用

GB/T 7714-2015 格式引文
MLA格式引文
APA格式引文